AEP Connors Run Booster Pump Station

Client

American Electric Power Company

Moundsville, West Virginia


  • New construction
  • 3,600-square-foot pumphouse
  • 3 months of construction
  • General contractor

Mascaro was responsible for the steel erection for the 50-foot high building, metal siding, piping, and HVAC during the construction of the pre-engineered metal building to house the booster pump station.