AHN Allegheny General Linac C Replacement

Client

Allegheny Health Network

Pittsburgh, Pennsylvania


  • Renovation
  • 5 months of construction
  • Construction manager at risk

The replacement of the Linear Accelerator C on the second level at the hospital required renovations to the area that included shielding modifications, IT/data cabling and communications, and updating the associated control room. Additionally, ancillary spaces were updated including toilet rooms to comply with ADA so that patients have access to the latest advances in level of care.