Consol Energy Knight AMD Treatment Facility

Client

CONSOL Energy Inc.

Mannington, West Virginia


  • 1700 GPM acid mine water treatment facility
  • General Contractor

The scope of work included construction of an acid mine drainage (AMD) water treatment facility. The pump building is comprised of block and plank with a concrete foundation and houses a lime silo, a truck unloading pad and sump, a pre-aeration basin, a ferrous reactor basin, a thickener, lime feed system, polymer feed system, sludge conditioning tank, sludge conditioning pumps, sludge recycle pumps, and sludge disposal pumps.