CSX J&L Tunnel Renovation

Client

CSX Transportation

Pittsburgh, Pennsylvania


  • Renovation
  • 15 months of construction
  • Design-build contractor

The improvements were needed to increase the vertical clearance inside the 1,600 linear-foot-long stretch of the tracks. Work included utility relocations, drainage improvements, and removal of overhead structures near both tunnel portals.