Penn State West Campus Steam Plant Conversion

Client

The Pennsylvania State University

University Park, Pennsylvania


  • 1,990 tons of concrete and steel demolition
  • 41 low clearance micropiles
  • 100 tons of structural steel
  • 2.411 cubic yards of excavation
  • 1,162 square feet of new masonry wall

Conversion of the facility from coal-fired to natural gas-fired took place in two separate phases based on boiler outages. Work included:

  • Complete civil and structural scope

  • Two turbine pedestals, 1.195 cubic yards of concrete each

  • Precast steam trench 240 lineal feet with cast-in-place vault

  • Roof modifications and repairs