S.R. 22 - Section B01

Client

Pennsylvania Department of Transportation

Murrysville, Pennsylvania


  • Two bridges
  • Two box culverts
  • One soldier pile wall
  • 200,000 cubic yards of excavation
  • 185 driveways
  • General contractor

This project involved the replacement of 3.1 miles of existing three-lane highway with five lanes. Work included upgrade and replacement of the storm water system and upgrades to nine signalized intersections. Recipient of the ABCD Outstanding New Multi-Span Bridge Award.