Y Loop and K Loop

Client

Confidential Client

Pennsylvania


  • New construction
  • 1,200 cubic yards of concrete
  • 180 tons of structural steel
  • 9 months of construction
  • General trades contractor

Mascaro was contracted by a confidential client to build a test stand for the water cooling pumps of Westinghouse’s AP1000 Nuclear Reactor. The AP1000 is a generation III+ nuclear power plant designed by Westinghouse. The test unit simulates actual operating conditions for the 250-ton electro-hydraulic pumps.